ComparisonMinimum RFQ vs Complete RFQ
OEM Sourcing: Framing Equipment RFQ Checklist
Side-by-side comparison
| Field | Minimum | Complete (recommended) |
|---|---|---|
| Daily volume | Frames per day estimate | SKU mix + peak season |
| Materials | Wood or PS | Wood, PS, MDF, aluminium + widths |
| Cutting | Manual or miter saw | CT vs NC stack cutter preference |
| Joining | Manual or pneumatic | Model class + nail size |
| Power / air | Available voltage | kW budget + compressor spec |
| Floor space | Rough m² | Layout sketch or column grid |
| Automation | Semi or full line | Conveyor / auto-feed requirements |
| Compliance | Destination country | CE + import clearance needs |
Decision tree
First time importing from China?
Include destination port and CE certificate request on the RFQ.
Unsure which underpinner class?
Add materials + daily volume — sales engineers map NN400/500/700 or NN300.
Need layout drawing?
Attach stick length range and ceiling height for line proposals.
FAQ
Where to submit the RFQ?
Use /contact/quote?product={slug} for model-specific quotes or the general quote form.
Typical response time?
Sales responds within one business day with spec confirmation questions.
Can I RFQ multiple models?
Yes — list all slugs or scenarios (starter / studio / factory) in the message body.
What makes an OEM framing-equipment RFQ complete?
Include daily volume, material and profile range, target models or automation level, destination, power and air conditions, floor space, and delivery terms.